About
Energy Map answers the first questions in building a solar farm in Ontario: where the grid can still take new power, which land could hold a farm, and which programs or buyers would sign a contract for it.
What's on the map
- All 1,253 Hydro One stations, coloured by how much generation each can still connect, with the path from each to the transmission grid.
- Power lines by voltage, feeder routes, and allocations that were likely never built.
- Candidate 1 km² sites for small, medium and large farms, screened for grid reach, prime farmland, wetlands and parks.
- Planned lines and station work, and the programs (LT2, corporate PPAs and others) with their deadlines.
Every number has a source
Values link to the page of the Hydro One PDF, the OpenStreetMap feature or the IESO document they come from, and the documents page has every source for download. Plans and program dates are checked weekly.
How it's built
Next.js and React, with the map drawn in WebGL (React Three Fiber) from compact binary tiles. A TypeScript and Python pipeline parses Hydro One's PDFs, places stations from OpenStreetMap and rates land from provincial and federal data. Unit, component, data-integrity and browser tests (including WCAG 2.2 accessibility checks) run on every change.
Limits
It's a screening tool, not an engineering study. Hydro One's Connection Impact Assessment and the IESO set the real limits, and program rules change. It isn't affiliated with Hydro One, the IESO or the Government of Ontario.
Who built it
Designed and built by Deleptual (opens in a new tab).