{"updated":"2026-10-25","note":"Curated from public grid plans and regulatory filings. Each item cites where it comes from; the weekly update job (docs/grid-updates.md) checks these sources and edits this file. Routes are not public until an application is filed, so lines are drawn straight between their end stations.","items":[{"id":"durham-kawartha-power-line","name":"Durham Kawartha Power Line","kind":"line","status":"applied","voltageKv":230,"lengthKm":55,"inService":"2029","summary":"A new double-circuit 230 kV line from Clarington TS to Dobbin TS near Peterborough, to support growth in central and eastern Ontario. Hydro One applied to the Ontario Energy Board for leave to construct in June 2026.","at":[{"name":"Clarington TS","lon":-78.8430191,"lat":43.9863431,"x":493.75456569703795,"y":-480.8415930103629,"citation":{"source":"osm-substations","osm":"way/481393007","detail":"\"Clarington TS\""}},{"name":"Dobbin TS","lon":-78.3924854,"lat":44.3100401,"x":526.6651616193809,"y":-441.95261892700637,"citation":{"source":"osm-substations","osm":"way/274716344","detail":"\"Dobbin TS\""}}],"stationIds":["dobbin-ts"],"sources":[{"title":"Hydro One seeks approval from the Ontario Energy Board to build the Durham Kawartha Power Line","url":"https://www.morning-times.com/ap/business/hydro-one-seeks-approval-from-the-ontario-energy-board-to-build-the-durham-kawartha-power/article_c22f6f95-00fd-5822-ab8c-6e027bd35cf0.html","publisher":"Hydro One (news release)","date":"2026-06-12"}],"checked":"2026-10-25"},{"id":"napanee-belleville-230","name":"Napanee to Belleville 230 kV line and Belleville switching station","kind":"line","status":"recommended","voltageKv":230,"lengthKm":33,"inService":null,"summary":"The Eastern Ontario Bulk Plan recommends a new 33 km double-circuit 230 kV line from Napanee to Belleville, a new switching station in Belleville and 100 Mvar of reactive compensation, triggered by demand growth. The same plan looks for more storage and solar supply in the Belleville, Picton and Napanee areas.","at":[{"name":"Napanee TS","lon":-77.003455,"lat":44.231059,"x":637.9297609797891,"y":-440.025797898129,"citation":{"source":"osm-substations","osm":"way/72877382","detail":"\"Napanee Transformer Station\""}},{"name":"Belleville TS","lon":-77.3786615,"lat":44.1907499,"x":608.5502711212329,"y":-447.56630839017726,"citation":{"source":"osm-substations","osm":"way/72944986","detail":"\"Belleville Transformer Station\""}}],"stationIds":["napanee-ts","belleville-ts"],"sources":[{"title":"Peterborough to Kingston regional planning, engagement presentation","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterborough-to-Kingston-20260729-presentation.pdf","publisher":"IESO","date":"2026-07-29"}],"checked":"2026-10-25"},{"id":"belleville-napanee-supply-opportunity","name":"IESO looking for storage and solar near Belleville, Picton and Napanee","kind":"opportunity","status":"recommended","voltageKv":null,"lengthKm":null,"inService":null,"summary":"As a non-wires option, the Eastern Ontario Bulk Plan points to additional storage and solar supply with a locational focus in the Belleville, Picton and Napanee areas, through the IESO's existing resource procurements.","at":[{"name":"Belleville TS","lon":-77.3786615,"lat":44.1907499,"x":608.5502711212329,"y":-447.56630839017726,"citation":{"source":"osm-substations","osm":"way/72944986","detail":"\"Belleville Transformer Station\""}},{"name":"Napanee TS","lon":-77.003455,"lat":44.231059,"x":637.9297609797891,"y":-440.025797898129,"citation":{"source":"osm-substations","osm":"way/72877382","detail":"\"Napanee Transformer Station\""}}],"stationIds":["belleville-ts","napanee-ts"],"sources":[{"title":"Peterborough to Kingston regional planning, engagement presentation","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterborough-to-Kingston-20260729-presentation.pdf","publisher":"IESO","date":"2026-07-29"}],"checked":"2026-10-25"},{"id":"belleville-ts-capacity","name":"Belleville TS capacity","kind":"station","status":"identified","voltageKv":230,"lengthKm":null,"inService":null,"summary":"Belleville TS is loaded close to its rating, without room for about 30 MW of connection inquiries. Options under study include a third 75/125 MVA transformer or a new set of transformers (DESN). A new Belleville switching station is now recommended (see the Napanee to Belleville line).","at":[{"name":"Belleville TS","lon":-77.3786615,"lat":44.1907499,"x":608.5502711212329,"y":-447.56630839017726,"citation":{"source":"osm-substations","osm":"way/72944986","detail":"\"Belleville Transformer Station\""}}],"stationIds":["belleville-ts"],"sources":[{"title":"Peterborough to Kingston Needs Assessment, 2nd cycle","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterboroug-to-Kingston-Needs-Assessment-report-2nd-cycle.pdf","publisher":"Hydro One / IESO","date":"2020-02-10"}],"checked":"2026-10-25"},{"id":"havelock-ts-transformers","name":"Havelock TS transformer replacement","kind":"station","status":"planned","voltageKv":230,"lengthKm":null,"inService":"2027","summary":"Transformers T1 and T2 (56 years old in 2020) are at end of life and are to be replaced with similar-sized units, targeted for 2027. Like-for-like, so no added capacity is expected. From the 2020 assessment; the 2024 assessment may have updated it.","at":[{"name":"Havelock TS","lon":-77.8409983,"lat":44.4625314,"x":568.8995221637006,"y":-421.0914437298725,"citation":{"source":"osm-substations","osm":"way/701208581","detail":"\"Havelock TS\""}}],"stationIds":["havelock-ts"],"sources":[{"title":"Peterborough to Kingston Needs Assessment, 2nd cycle","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterboroug-to-Kingston-Needs-Assessment-report-2nd-cycle.pdf","publisher":"Hydro One / IESO","date":"2020-02-10"}],"checked":"2026-10-25"},{"id":"sidney-ts-capacity","name":"Sidney TS capacity need","kind":"station","status":"identified","voltageKv":null,"lengthKm":null,"inService":"2032","summary":"A station capacity need at Sidney TS (Quinte West), with a winter need year of 2032, growing to about 20 MW by 2044. Being studied in the regional plan due Q4 2026.","at":[{"name":"Sidney TS","lon":-77.59503,"lat":44.13098,"x":591.977,"y":-455.891,"citation":{"source":"osm-substations","osm":"way/810466511","detail":"\"Sidney Transformer Station\""}}],"stationIds":["sidney-ts"],"sources":[{"title":"Peterborough to Kingston regional planning, engagement presentation","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterborough-to-Kingston-20260729-presentation.pdf","publisher":"IESO","date":"2026-07-29"}],"checked":"2026-10-25"},{"id":"napanee-ts-capacity","name":"Napanee TS capacity need","kind":"station","status":"identified","voltageKv":null,"lengthKm":null,"inService":"2035","summary":"A station capacity need at Napanee TS, with a summer need year of 2035 and winter of 2037, about 10 MW by 2044.","at":[{"name":"Napanee TS","lon":-77.003455,"lat":44.231059,"x":637.9297609797891,"y":-440.025797898129,"citation":{"source":"osm-substations","osm":"way/72877382","detail":"\"Napanee Transformer Station\""}}],"stationIds":["napanee-ts"],"sources":[{"title":"Peterborough to Kingston regional planning, engagement presentation","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterborough-to-Kingston-20260729-presentation.pdf","publisher":"IESO","date":"2026-07-29"}],"checked":"2026-10-25"},{"id":"peterborough-quinte-west-115","name":"Peterborough to Quinte West 115 kV supply","kind":"need","status":"identified","voltageKv":115,"lengthKm":null,"inService":"2027","summary":"Thermal overloads and voltage violations on the 115 kV supply from Peterborough to Quinte West, with need years of 2027 (winter) and 2029 (summer). No solution chosen yet; the line route isn't drawn.","at":[],"stationIds":["dobbin-ts","sidney-ts"],"sources":[{"title":"Peterborough to Kingston regional planning, engagement presentation","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/regional-planning/Peterborough-to-Kingston/Peterborough-to-Kingston-20260729-presentation.pdf","publisher":"IESO","date":"2026-07-29"}],"checked":"2026-10-25"},{"id":"bowmanville-gta-500","name":"Bowmanville to GTA 500 kV line","kind":"station","status":"designated","voltageKv":500,"lengthKm":null,"inService":"early 2030s","summary":"A new double-circuit 500 kV line from Bowmanville Switching Station to Parkway, Claireville or Cherrywood TS (not yet chosen). Ontario designated it a priority project and directed Hydro One to develop it, with First Nations able to take a 50% stake. Only the Bowmanville end is drawn until the route is chosen.","at":[{"name":"Bowmanville SS","lon":-78.724853,"lat":43.8771452,"x":504.21297156356746,"y":-492.16615926446593,"citation":{"source":"osm-substations","osm":"way/33728777","detail":"\"Bowmanville SS\""}}],"stationIds":[],"sources":[{"title":"Ontario selects Hydro One to invest in priority transmission line in partnership with First Nations","url":"https://hydroone.mediaroom.com/2025-11-24-Ontario-selects-Hydro-One-to-invest-in-priority-transmission-line-in-partnership-with-First-Nations","publisher":"Hydro One","date":"2025-11-24"}],"checked":"2026-10-25"},{"id":"northeast-power-line","name":"Northeast Power Line","kind":"line","status":"applied","voltageKv":500,"lengthKm":null,"inService":"2029","summary":"A single-circuit 500 kV line from Hanmer TS (Greater Sudbury) to Mississagi TS, adding about 900 MW of transfer capability between northeast and northwest Ontario (about $1.8 billion). Leave-to-construct application filed May 19, 2026.","at":[{"name":"Hanmer TS","lon":-80.91588,"lat":46.625384,"x":311.95152448293805,"y":-199.46005821199014,"citation":{"source":"osm-substations","osm":"way/246652207","detail":"\"Hanmer TS\""}},{"name":"Mississagi TS","lon":-83.3797196,"lat":46.4283863,"x":124.27682883898416,"y":-228.38651035717066,"citation":{"source":"osm-substations","osm":"way/258710670","detail":"\"Mississagi TS\""}}],"stationIds":[],"sources":[{"title":"Hydro One seeks OEB approval for two major 500 kV transmission projects","url":"https://electricityforum.com/td/overhead-td/hydro-one-500-kv-transmission-projects-oeb-filings","publisher":"Electricity Forum","date":"2026-05-19"}],"checked":"2026-10-25"},{"id":"longwood-lakeshore","name":"Longwood to Lakeshore line","kind":"line","status":"applied","voltageKv":500,"lengthKm":null,"inService":"2030","summary":"A single-circuit 500 kV line from Longwood TS (Strathroy-Caradoc) to Lakeshore TS, adding about 550 MW to the Windsor-Essex region (about $1.2 billion). Leave-to-construct application filed May 19, 2026.","at":[{"name":"Longwood TS","lon":-81.5864549,"lat":42.8553616,"x":279.61812942452735,"y":-620.4575661602639,"citation":{"source":"osm-substations","osm":"way/180763902","detail":"\"Longwood TS\""}},{"name":"Lakeshore TS","lon":-82.6069768,"lat":42.2083093,"x":198.33129638588227,"y":-695.7268328046812,"citation":{"source":"osm-substations","osm":"way/1123935154","detail":"\"Lakeshore Transmission Station\""}}],"stationIds":["longwood-ts"],"sources":[{"title":"Hydro One seeks OEB approval for two major 500 kV transmission projects","url":"https://electricityforum.com/td/overhead-td/hydro-one-500-kv-transmission-projects-oeb-filings","publisher":"Electricity Forum","date":"2026-05-19"}],"checked":"2026-10-25"},{"id":"north-shore-link","name":"North Shore Link","kind":"line","status":"applied","voltageKv":230,"lengthKm":null,"inService":"2029","summary":"A new 230 kV line from Mississagi TS near Wharncliffe to Third Line TS in Sault Ste. Marie (about $1.3 billion), with up to nine First Nation partners. Leave-to-construct application filed September 11, 2026.","at":[{"name":"Mississagi TS","lon":-83.3797196,"lat":46.4283863,"x":124.27682883898416,"y":-228.38651035717066,"citation":{"source":"osm-substations","osm":"way/258710670","detail":"\"Mississagi TS\""}},{"name":"Third Line TS","lon":-84.3274156,"lat":46.5549696,"x":51.46649109979184,"y":-215.4441692514256,"citation":{"source":"osm-substations","osm":"way/264969866","detail":"\"Third Line TS\""}}],"stationIds":[],"sources":[{"title":"Hydro One seeks approval from the Ontario Energy Board to build the North Shore Link","url":"https://www.placera.se/pressmeddelanden/hydro-one-hydro-one-seeks-approval-from-the-ontario-energy-board-to-build-the-north-shore-link-20260911","publisher":"Hydro One (news release)","date":"2026-09-11"}],"checked":"2026-10-25"}]}