{"updated":"2026-10-26","note":"Curated from IESO, Government of Ontario and law-firm summaries of public program documents. Each program, rule and date cites where it comes from; the weekly update (docs/grid-updates.md) checks these sources and edits this file. Dates the source gives as a quarter or month are shown that way, and ones it calls approximate are marked expected.","programs":[{"id":"lt2-window-2","name":"IESO LT2 Window 2 (new energy and capacity contracts)","short":"LT2 Window 2","channel":"procurement","status":"upcoming","summary":"The IESO's second window of the Long-Term 2 RFP: 20-year contracts for new and repowered supply. The energy stream (LT2(e-2)) suits solar; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6 TWh a year of energy and at least 400 MW of capacity. Proposals are expected in Q2–Q3 2027 and contracts in Q1 2028, with projects in service by May 1, 2032. Final rules come with the Q1 2027 RFP.","sizeMw":{"min":1,"max":null},"connection":"any","solar":true,"storage":true,"rules":[{"kind":"gate","text":"A Municipal Support Confirmation is mandatory for every proposal, and must be in hand before you submit.","source":0},{"kind":"gate","text":"No new ground-mounted solar in Prime Agricultural Areas (and no new projects in Specialty Crop Areas); the Window 1 land rules are expected to carry over, subject to government direction.","source":1},{"kind":"gate","text":"Projects under 1 MW aren't eligible; they're pointed to the Local Generation Program.","source":1},{"kind":"points","text":"Up to 6 rated points for Indigenous economic participation. All 14 Window 1 winners had an Indigenous equity partner holding about 50%.","source":1},{"kind":"points","text":"Up to 2 points for location, plus up to 3 more for not being in a prime agricultural area.","source":1},{"kind":"note","text":"A supply chain disclosure plan is required; Canadian-content commitments are optional (the Long Lead-Time RFP used 60% of capital cost as an example).","source":2},{"kind":"note","text":"The maximum proposal fee may rise from $10,000 to $25,000, pending Ontario Energy Board approval.","source":2},{"kind":"note","text":"Facilities that can provide 20 MW or more must be regulation-ready (at least 10 MW of regulation, ramping 5 MW a minute).","source":1},{"kind":"note","text":"Window 1 for comparison: 12 solar projects (915 MW) won, all outside Prime Agricultural Areas, at a weighted average of $87.80/MWh.","source":3},{"kind":"note","text":"LT2 runs several windows over about four years, so a project that misses Window 2 can aim for the next.","source":0}],"milestones":[{"date":"2026-07-01","precision":"month","label":"Draft RFPs and contracts posted","source":0},{"date":"2026-10-15","precision":"day","label":"Preliminary connection (deliverability) guidance posted","source":1},{"date":"2026-10-30","precision":"day","label":"Written feedback on the drafts due to the IESO","deadline":true,"source":1},{"date":"2027-01-01","precision":"quarter","label":"Final RFPs and contracts posted","source":1},{"date":"2027-04-01","end":"2027-09-30","precision":"quarter","label":"Proposals due (council support needed before this)","deadline":true,"source":0},{"date":"2027-07-01","precision":"month","label":"Final deliverability guidance, by","source":1},{"date":"2028-01-01","precision":"quarter","label":"Contracts awarded","source":0},{"date":"2032-05-01","precision":"day","label":"Projects in service","deadline":true,"source":1}],"siteRule":{"minMw":1,"maxMw":null,"connections":["ds","feeder","ts"]},"relatedPlanned":["belleville-napanee-supply-opportunity"],"sources":[{"title":"Long-Term 2 (LT2) RFP Window 2, community engagement presentation","url":"https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-term-rfp-community/lt2-rfp-window2-community-20260708-presentation.pdf","publisher":"IESO","date":"2026-07-08"},{"title":"Procurement future for repowered facilities in Ontario (LT2(2) and MT3)","url":"https://www.blakes.com/insights/procurement-future-for-repowered-facilities-in-ontario/","publisher":"Blakes","date":"2026-10-20"},{"title":"IESO's Long-Term 2 RFP Window 2: key developments and emerging issues","url":"https://www.blg.com/en/insights/2026/06/iesos-long-term-2-rfp-window-2-key-developments-and-emerging-issues","publisher":"BLG","date":"2026-06-01","approximateDate":true},{"title":"LT2 Window 1 results overview","url":"https://www.ieso.ca/-/media/Files/IESO/Document-Library/long-term-rfp/LT2-W1-results-overview.pdf","publisher":"IESO","date":"2026-04-01","approximateDate":true}],"checked":"2026-10-26"},{"id":"local-generation-program","name":"IESO Local Generation Program (100 kW to 10 MW, distribution-connected)","short":"Local Generation Program","channel":"procurement","status":"stalled","summary":"A planned IESO program for distribution-connected generation from 100 kW to 10 MW: recontracting existing facilities (about 1,600, mostly FIT and RESOP-era) as their contracts expire over the next ten years, plus expansions and new builds. The Minister targeted a 2026 launch, but the IESO hasn't posted an update since June 2025 and the new-build rules haven't been released.","sizeMw":{"min":0.1,"max":10},"connection":"distribution","solar":true,"storage":false,"rules":[{"kind":"gate","text":"Distribution-connected, 100 kW to 10 MW.","source":0},{"kind":"note","text":"Recontracting comes first; expansions and new builds are part of the design, but their rules (\"Phase 2\") aren't out.","source":1},{"kind":"note","text":"The IESO's page names generating resources (solar, wind, biogas, combined heat and power); storage isn't mentioned.","source":0}],"milestones":[{"date":"2025-04-23","precision":"day","label":"Engagement opened","source":0},{"date":"2025-06-25","precision":"day","label":"Last IESO update (response to feedback)","source":0},{"date":"2026-01-01","precision":"year","label":"Target launch (not confirmed)","source":0}],"siteRule":{"minMw":0.1,"maxMw":10,"connections":["ds","feeder"]},"relatedPlanned":[],"sources":[{"title":"Local Generation Program engagement","url":"https://ieso.ca/en/Sector-Participants/Engagement-Initiatives/Engagements/Local-Generation-Program","publisher":"IESO","date":"2025-06-25"},{"title":"While the world accelerates DERs, Ontario's Local Generation Program is on hold","url":"https://www.orec.ca/post/while-the-world-accelerates-ders-ontario-keeps-us-on-hold","publisher":"Ottawa Renewable Energy Co-operative","date":"2026-08-26"}],"checked":"2026-10-26"},{"id":"corporate-ppa","name":"Corporate power purchase agreements with large power users (C-PPA)","short":"Corporate PPA","channel":"private","status":"ongoing","summary":"Since the June 2025 amendments to O. Reg. 429/04, Class A (ICI) customers can lower their Global Adjustment charges by buying power from an eligible generator under a corporate PPA. A new solar farm can sell to one, outside the IESO procurements. Customers register each PPA with the IESO in a yearly window, February 1 to March 30, before the base period starts on May 1.","sizeMw":{"min":null,"max":null},"connection":"any","solar":true,"storage":false,"rules":[{"kind":"gate","text":"The buyer must be a Class A (ICI) customer, and both buyer and generator must be IESO market participants.","source":0},{"kind":"gate","text":"A facility not yet operating needs a Municipal Support Resolution from each host municipality, confirming support and that it won't be in a prime agricultural area.","source":0},{"kind":"gate","text":"The power must be delivered to the IESO grid or a licensed distributor, and can't already be under an IESO or OEFC contract.","source":0},{"kind":"gate","text":"Energy that went through storage doesn't count.","source":0}],"milestones":[{"date":"2025-06-05","precision":"day","label":"Regulation amended (O. Reg. 429/04)","source":0},{"date":"2026-01-14","precision":"day","label":"Program guideline and forms released","source":0},{"date":"2026-02-01","precision":"day","label":"First submission window opened","source":0},{"date":"2026-03-30","precision":"day","label":"First submission window closed","source":0},{"date":"2026-05-01","precision":"day","label":"First base period starts","source":0},{"date":"2027-02-01","precision":"day","label":"Next submission window opens (2027–28)","inferred":true,"source":1},{"date":"2027-03-30","precision":"day","label":"Next submission window closes (2027–28)","deadline":true,"inferred":true,"source":1},{"date":"2027-05-15","precision":"day","label":"Post-base-period package due (2026–27)","source":0}],"siteRule":{"minMw":null,"maxMw":null,"connections":["ds","feeder","ts"]},"relatedPlanned":[],"sources":[{"title":"Corporate power purchase agreements for large load customers in Ontario: final program guideline and upcoming submission window","url":"https://www.torys.com/en/our-latest-thinking/publications/2026/01/corporate-power-purchase-agreements-for-large-load-customers-in-ontario","publisher":"Torys","date":"2026-01-26"},{"title":"Corporate Power Purchase Agreements (C-PPAs) for ICI Participants","url":"https://www.ieso.ca/Sector-Participants/Settlements/Corporate-Power-Purchase-Agreements-for-ICI-Participants","publisher":"IESO","date":"2026-01-14"}],"checked":"2026-10-26"},{"id":"net-metering-third-party","name":"Net metering with third-party ownership (behind the meter)","short":"Net metering","channel":"private","status":"ongoing","summary":"Since July 1, 2022, a third party can own a renewable system behind a farm's or business's meter and sell it the power (by lease, financing or PPA), with the customer earning net metering credits for the surplus. It's a small-project channel on the customer's own property, so it isn't tied to the site squares.","sizeMw":{"min":null,"max":null},"connection":"behind-the-meter","solar":true,"storage":false,"rules":[{"kind":"gate","text":"Renewable, behind the customer's meter, and generating primarily for the customer's own use.","source":1},{"kind":"gate","text":"The distributor must allow the connection; with Hydro One, anything over 12 kW needs a Connection Impact Assessment (Form B).","source":1},{"kind":"note","text":"Surplus credits carry forward 12 months; demand-rate customers get no credit on demand charges.","source":1},{"kind":"note","text":"Third-party ownership came in with O. Reg. 386/22 and 387/22; virtual net metering wasn't included.","source":0}],"milestones":[{"date":"2022-07-01","precision":"day","label":"Third-party ownership allowed","source":0}],"siteRule":null,"relatedPlanned":[],"sources":[{"title":"Ontario amends net metering regulation for third-party ownership","url":"https://www.osler.com/en/blogs/energy/may-2022/ontario-amends-net-metering-regulation-for-third-party-ownership","publisher":"Osler","date":"2022-05-01","approximateDate":true},{"title":"Net Metering","url":"https://www.hydroone.com/business-services/generators/net-metering","publisher":"Hydro One","date":"2026-10-26","retrieved":true}],"checked":"2026-10-26"},{"id":"long-lead-time-rfp","name":"IESO Long Lead-Time RFP (hydro and long-duration storage)","short":"Long Lead-Time RFP","channel":"procurement","status":"open","summary":"An IESO RFP for new hydroelectric projects (1 MW and up) and long-duration storage (10 MW and up, such as compressed air, pumped hydro or liquid air). It is not for solar or typical lithium batteries; it's listed so its deadlines aren't mistaken for LT2's.","sizeMw":{"min":1,"max":null},"connection":"any","solar":false,"storage":false,"rules":[{"kind":"gate","text":"New hydro (1 MW and up) or long-duration storage (10 MW and up) only; no solar or short-duration batteries.","source":0}],"milestones":[{"date":"2026-09-23","precision":"day","label":"Registration opens","source":0},{"date":"2026-10-06","precision":"day","label":"Registration closes","deadline":true,"source":0},{"date":"2026-11-26","precision":"day","label":"Proposals due","deadline":true,"source":0},{"date":"2027-05-25","precision":"day","label":"Selected proponents notified","source":0}],"siteRule":null,"relatedPlanned":[],"sources":[{"title":"Updates to the IESO's Long Lead-Time and LT2 Window 2 RFPs: timelines, incentives and next steps","url":"https://www.torys.com/en/our-latest-thinking/publications/2026/04/ieso-updates","publisher":"Torys","date":"2026-04-09"}],"checked":"2026-10-26"},{"id":"local-calls","name":"Calls for projects from utilities, towns, First Nations and large new loads","short":"Local calls","channel":"local","status":"ongoing","summary":"Local utilities, municipalities and First Nations sometimes issue their own requests for solar or storage, and large new loads (factories, data centres) look for on-site or nearby supply. There's no single list; the weekly update searches for new ones and adds each as its own entry here. The IESO's 2026 outlook expects demand to grow 65% by 2050, with an energy need emerging in 2032.","sizeMw":{"min":null,"max":null},"connection":"any","solar":true,"storage":true,"rules":[{"kind":"note","text":"Terms vary by call; most still need council support and a grid connection.","source":null}],"milestones":[],"siteRule":null,"relatedPlanned":[],"sources":[{"title":"2026 Annual Planning Outlook summary","url":"https://ieso.ca/Sector-Participants/Planning-and-Forecasting/Annual-Planning-Outlook/2026-APO-Summary","publisher":"IESO","date":"2026-10-26","retrieved":true}],"checked":"2026-10-26"}]}