BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Energy map//Ontario solar opportunities//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Ontario solar opportunities
BEGIN:VEVENT
UID:lt2-window-2-0@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:LT2 Window 2: Draft RFPs and contracts posted (sometime in July 202
 6)
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: IESO\, 2026
 -07-08\, https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-t
 erm-rfp-community/lt2-rfp-window2-community-20260708-presentation.pdf\nChe
 cked 2026-10-26.
URL:https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-term-rf
 p-community/lt2-rfp-window2-community-20260708-presentation.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-1@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:LT2 Window 2: Preliminary connection (deliverability) guidance post
 ed
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: Blakes\, 20
 26-10-20\, https://www.blakes.com/insights/procurement-future-for-repowere
 d-facilities-in-ontario/\nChecked 2026-10-26.
URL:https://www.blakes.com/insights/procurement-future-for-repowered-facili
 ties-in-ontario/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-2@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20261030
DTEND;VALUE=DATE:20261031
SUMMARY:Deadline: LT2 Window 2: Written feedback on the drafts due to the I
 ESO
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: Blakes\, 20
 26-10-20\, https://www.blakes.com/insights/procurement-future-for-repowere
 d-facilities-in-ontario/\nChecked 2026-10-26.
URL:https://www.blakes.com/insights/procurement-future-for-repowered-facili
 ties-in-ontario/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-3@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:LT2 Window 2: Final RFPs and contracts posted (sometime in Q1 2027)
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: Blakes\, 20
 26-10-20\, https://www.blakes.com/insights/procurement-future-for-repowere
 d-facilities-in-ontario/\nChecked 2026-10-26.
URL:https://www.blakes.com/insights/procurement-future-for-repowered-facili
 ties-in-ontario/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-4@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:Deadline: LT2 Window 2: Proposals due (council support needed befor
 e this) (sometime in Q2–Q3 2027)
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: IESO\, 2026
 -07-08\, https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-t
 erm-rfp-community/lt2-rfp-window2-community-20260708-presentation.pdf\nChe
 cked 2026-10-26.
URL:https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-term-rf
 p-community/lt2-rfp-window2-community-20260708-presentation.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-5@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270701
DTEND;VALUE=DATE:20270702
SUMMARY:LT2 Window 2: Final deliverability guidance\, by (sometime in July 
 2027)
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: Blakes\, 20
 26-10-20\, https://www.blakes.com/insights/procurement-future-for-repowere
 d-facilities-in-ontario/\nChecked 2026-10-26.
URL:https://www.blakes.com/insights/procurement-future-for-repowered-facili
 ties-in-ontario/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-6@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:LT2 Window 2: Contracts awarded (sometime in Q1 2028)
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: IESO\, 2026
 -07-08\, https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-t
 erm-rfp-community/lt2-rfp-window2-community-20260708-presentation.pdf\nChe
 cked 2026-10-26.
URL:https://ieso.ca/-/media/Files/IESO/Document-Library/engage/long-term-rf
 p-community/lt2-rfp-window2-community-20260708-presentation.pdf
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lt2-window-2-7@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20320501
DTEND;VALUE=DATE:20320502
SUMMARY:Deadline: LT2 Window 2: Projects in service
DESCRIPTION:The IESO's second window of the Long-Term 2 RFP: 20-year contra
 cts for new and repowered supply. The energy stream (LT2(e-2)) suits solar
 \; the capacity stream (LT2(c-2)) suits storage. New-build targets are 3.6
  TWh a year of energy and at least 400 MW of capacity. Proposals are expec
 ted in Q2–Q3 2027 and contracts in Q1 2028\, with projects in service by
  May 1\, 2032. Final rules come with the Q1 2027 RFP.\nSource: Blakes\, 20
 26-10-20\, https://www.blakes.com/insights/procurement-future-for-repowere
 d-facilities-in-ontario/\nChecked 2026-10-26.
URL:https://www.blakes.com/insights/procurement-future-for-repowered-facili
 ties-in-ontario/
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:local-generation-program-0@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20250423
DTEND;VALUE=DATE:20250424
SUMMARY:Local Generation Program: Engagement opened
DESCRIPTION:A planned IESO program for distribution-connected generation fr
 om 100 kW to 10 MW: recontracting existing facilities (about 1\,600\, most
 ly FIT and RESOP-era) as their contracts expire over the next ten years\, 
 plus expansions and new builds. The Minister targeted a 2026 launch\, but 
 the IESO hasn't posted an update since June 2025 and the new-build rules h
 aven't been released.\nSource: IESO\, 2025-06-25\, https://ieso.ca/en/Sect
 or-Participants/Engagement-Initiatives/Engagements/Local-Generation-Progra
 m\nChecked 2026-10-26.
URL:https://ieso.ca/en/Sector-Participants/Engagement-Initiatives/Engagemen
 ts/Local-Generation-Program
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:local-generation-program-1@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20250625
DTEND;VALUE=DATE:20250626
SUMMARY:Local Generation Program: Last IESO update (response to feedback)
DESCRIPTION:A planned IESO program for distribution-connected generation fr
 om 100 kW to 10 MW: recontracting existing facilities (about 1\,600\, most
 ly FIT and RESOP-era) as their contracts expire over the next ten years\, 
 plus expansions and new builds. The Minister targeted a 2026 launch\, but 
 the IESO hasn't posted an update since June 2025 and the new-build rules h
 aven't been released.\nSource: IESO\, 2025-06-25\, https://ieso.ca/en/Sect
 or-Participants/Engagement-Initiatives/Engagements/Local-Generation-Progra
 m\nChecked 2026-10-26.
URL:https://ieso.ca/en/Sector-Participants/Engagement-Initiatives/Engagemen
 ts/Local-Generation-Program
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:local-generation-program-2@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260101
DTEND;VALUE=DATE:20260102
SUMMARY:Local Generation Program: Target launch (not confirmed) (sometime i
 n 2026)
DESCRIPTION:A planned IESO program for distribution-connected generation fr
 om 100 kW to 10 MW: recontracting existing facilities (about 1\,600\, most
 ly FIT and RESOP-era) as their contracts expire over the next ten years\, 
 plus expansions and new builds. The Minister targeted a 2026 launch\, but 
 the IESO hasn't posted an update since June 2025 and the new-build rules h
 aven't been released.\nSource: IESO\, 2025-06-25\, https://ieso.ca/en/Sect
 or-Participants/Engagement-Initiatives/Engagements/Local-Generation-Progra
 m\nChecked 2026-10-26.
URL:https://ieso.ca/en/Sector-Participants/Engagement-Initiatives/Engagemen
 ts/Local-Generation-Program
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-0@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20250605
DTEND;VALUE=DATE:20250606
SUMMARY:Corporate PPA: Regulation amended (O. Reg. 429/04)
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-1@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260114
DTEND;VALUE=DATE:20260115
SUMMARY:Corporate PPA: Program guideline and forms released
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-2@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260201
DTEND;VALUE=DATE:20260202
SUMMARY:Corporate PPA: First submission window opened
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-3@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260330
DTEND;VALUE=DATE:20260331
SUMMARY:Corporate PPA: First submission window closed
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-4@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260501
DTEND;VALUE=DATE:20260502
SUMMARY:Corporate PPA: First base period starts
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-5@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270201
DTEND;VALUE=DATE:20270202
SUMMARY:Corporate PPA: Next submission window opens (2027–28)
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nProjected from the program's yearly schedule\; confirm 
 with the IESO.\nSource: IESO\, 2026-01-14\, https://www.ieso.ca/Sector-Par
 ticipants/Settlements/Corporate-Power-Purchase-Agreements-for-ICI-Particip
 ants\nChecked 2026-10-26.
URL:https://www.ieso.ca/Sector-Participants/Settlements/Corporate-Power-Pur
 chase-Agreements-for-ICI-Participants
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-6@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270330
DTEND;VALUE=DATE:20270331
SUMMARY:Deadline: Corporate PPA: Next submission window closes (2027–28)
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nProjected from the program's yearly schedule\; confirm 
 with the IESO.\nSource: IESO\, 2026-01-14\, https://www.ieso.ca/Sector-Par
 ticipants/Settlements/Corporate-Power-Purchase-Agreements-for-ICI-Particip
 ants\nChecked 2026-10-26.
URL:https://www.ieso.ca/Sector-Participants/Settlements/Corporate-Power-Pur
 chase-Agreements-for-ICI-Participants
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:corporate-ppa-7@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270515
DTEND;VALUE=DATE:20270516
SUMMARY:Corporate PPA: Post-base-period package due (2026–27)
DESCRIPTION:Since the June 2025 amendments to O. Reg. 429/04\, Class A (ICI
 ) customers can lower their Global Adjustment charges by buying power from
  an eligible generator under a corporate PPA. A new solar farm can sell to
  one\, outside the IESO procurements. Customers register each PPA with the
  IESO in a yearly window\, February 1 to March 30\, before the base period
  starts on May 1.\nSource: Torys\, 2026-01-26\, https://www.torys.com/en/o
 ur-latest-thinking/publications/2026/01/corporate-power-purchase-agreement
 s-for-large-load-customers-in-ontario\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/01/corpo
 rate-power-purchase-agreements-for-large-load-customers-in-ontario
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:net-metering-third-party-0@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20220701
DTEND;VALUE=DATE:20220702
SUMMARY:Net metering: Third-party ownership allowed
DESCRIPTION:Since July 1\, 2022\, a third party can own a renewable system 
 behind a farm's or business's meter and sell it the power (by lease\, fina
 ncing or PPA)\, with the customer earning net metering credits for the sur
 plus. It's a small-project channel on the customer's own property\, so it 
 isn't tied to the site squares.\nSource: Osler\, May 2022\, https://www.os
 ler.com/en/blogs/energy/may-2022/ontario-amends-net-metering-regulation-fo
 r-third-party-ownership\nChecked 2026-10-26.
URL:https://www.osler.com/en/blogs/energy/may-2022/ontario-amends-net-meter
 ing-regulation-for-third-party-ownership
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:long-lead-time-rfp-0@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20260923
DTEND;VALUE=DATE:20260924
SUMMARY:Long Lead-Time RFP: Registration opens
DESCRIPTION:An IESO RFP for new hydroelectric projects (1 MW and up) and lo
 ng-duration storage (10 MW and up\, such as compressed air\, pumped hydro 
 or liquid air). It is not for solar or typical lithium batteries\; it's li
 sted so its deadlines aren't mistaken for LT2's.\nSource: Torys\, 2026-04-
 09\, https://www.torys.com/en/our-latest-thinking/publications/2026/04/ies
 o-updates\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/04/ieso-
 updates
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:long-lead-time-rfp-1@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261007
SUMMARY:Deadline: Long Lead-Time RFP: Registration closes
DESCRIPTION:An IESO RFP for new hydroelectric projects (1 MW and up) and lo
 ng-duration storage (10 MW and up\, such as compressed air\, pumped hydro 
 or liquid air). It is not for solar or typical lithium batteries\; it's li
 sted so its deadlines aren't mistaken for LT2's.\nSource: Torys\, 2026-04-
 09\, https://www.torys.com/en/our-latest-thinking/publications/2026/04/ies
 o-updates\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/04/ieso-
 updates
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:long-lead-time-rfp-2@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20261126
DTEND;VALUE=DATE:20261127
SUMMARY:Deadline: Long Lead-Time RFP: Proposals due
DESCRIPTION:An IESO RFP for new hydroelectric projects (1 MW and up) and lo
 ng-duration storage (10 MW and up\, such as compressed air\, pumped hydro 
 or liquid air). It is not for solar or typical lithium batteries\; it's li
 sted so its deadlines aren't mistaken for LT2's.\nSource: Torys\, 2026-04-
 09\, https://www.torys.com/en/our-latest-thinking/publications/2026/04/ies
 o-updates\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/04/ieso-
 updates
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:long-lead-time-rfp-3@energy-map
DTSTAMP:20261026T000000Z
DTSTART;VALUE=DATE:20270525
DTEND;VALUE=DATE:20270526
SUMMARY:Long Lead-Time RFP: Selected proponents notified
DESCRIPTION:An IESO RFP for new hydroelectric projects (1 MW and up) and lo
 ng-duration storage (10 MW and up\, such as compressed air\, pumped hydro 
 or liquid air). It is not for solar or typical lithium batteries\; it's li
 sted so its deadlines aren't mistaken for LT2's.\nSource: Torys\, 2026-04-
 09\, https://www.torys.com/en/our-latest-thinking/publications/2026/04/ies
 o-updates\nChecked 2026-10-26.
URL:https://www.torys.com/en/our-latest-thinking/publications/2026/04/ieso-
 updates
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR